Engineered upper-floor steel framing designed to mount seamlessly onto poured concrete podiums, subterranean basements, or central elevator cores.
Precision baseplates, heavy chemical anchor systems, and shear-stud embedment plans
S355 Structural Steel + S350GD Galvanized Upper-Level Framing
Concrete base provides sound & fire buffer; steel top provides rapid construction speed
Engineered interface anchor plates and anchor bolt templates shipped prior to main structure
SerBuild manufactures Steel Structure + Concrete Core / Podium using dedicated CNC roll-forming lines integrated directly with our 3D BIM modeling software.
Every hole, dimple, lip, and service opening is pre-punched to 0.5mm accuracy before profile folding. This eliminates on-site measuring, cutting, and drilling errors, allowing construction crews to assemble components with simple hand tools.
Detailed answers to technical, manufacturing, export, and on-site assembly questions.
SerBuild designs and manufactures light gauge steel (LGSF) and heavy structural steel buildings for residential developments, industrial warehouses, manufacturing factories, aircraft hangars, commercial offices, and agricultural halls.
Yes. All structural engineering is performed strictly according to Eurocodes (EN 1990, EN 1991, EN 1993, EN 1998) including project-specific National Annex parameters for local snow, wind, and seismic loads.
We offer five flexible delivery packages: Engineering Only, Supply Only (containerized flat-pack kit), Supply with On-Site Supervision, Complete Frame Installation, and Turnkey Project Delivery in eligible regions.
Components are precision roll-formed or cut, permanent piece-marked, and packed in dense weather-protected flat-pack bundles optimized for 40ft High Cube containers, accompanied by detailed 3D packing lists and assembly manuals.
Submit your project location, building dimensions (width, length, eave height), intended use, and any available architectural drawings or sketches via our 5-step RFQ form. Our engineering team reviews the submission and responds within 24–48 hours.
Real-world evidence of precision Eurocode engineering, containerized export, and on-site assembly execution.
Challenge: Severe coastal bora wind gusts (up to 180 km/h) and high seismic ground acceleration in the Adriatic coastal z...
Challenge: 30-meter column-free clear span required to maximize high-bay pallet racking, integrated with a 10-ton overhea...
Challenge: 12 integrated loading docks, high internal clearance of 12 meters, strict NF EN French Eurocode compliance, an...
Submit your project dimensions, drawings or requirements for an engineering review and itemized quote within 24–48 hours.