| Structural Technology | Heavy Structural Steel Portal Frames & Roof Trusses |
|---|---|
| Steel Grade & Coating | S355J2 Structural Steel + S350GD Galvanized Purlins |
| Delivery Scope | Supply + Supervision |
| Key Engineering Result | Handed over on schedule; achieved RE2020 energy compliance and flawless structural inspection approval. |
12 integrated loading docks, high internal clearance of 12 meters, strict NF EN French Eurocode compliance, and tight delivery sequencing across 14 container loads.
Pre-engineered multi-bay portal frame structure with custom dock-leveler perimeter frames and early fire suppression sprinkler pipe support trusses.
Detailed answers to technical, manufacturing, export, and on-site assembly questions.
SerBuild designs and manufactures light gauge steel (LGSF) and heavy structural steel buildings for residential developments, industrial warehouses, manufacturing factories, aircraft hangars, commercial offices, and agricultural halls.
Yes. All structural engineering is performed strictly according to Eurocodes (EN 1990, EN 1991, EN 1993, EN 1998) including project-specific National Annex parameters for local snow, wind, and seismic loads.
We offer five flexible delivery packages: Engineering Only, Supply Only (containerized flat-pack kit), Supply with On-Site Supervision, Complete Frame Installation, and Turnkey Project Delivery in eligible regions.
Components are precision roll-formed or cut, permanent piece-marked, and packed in dense weather-protected flat-pack bundles optimized for 40ft High Cube containers, accompanied by detailed 3D packing lists and assembly manuals.
Submit your project location, building dimensions (width, length, eave height), intended use, and any available architectural drawings or sketches via our 5-step RFQ form. Our engineering team reviews the submission and responds within 24–48 hours.
Submit your project dimensions, drawings or requirements for an engineering review and itemized quote within 24–48 hours.