High-performance membrane systems creating a continuous weathertight and airtight building envelope, protecting steel frames from moisture infiltration.
Microporous polypropylene breathable weather barriers + reinforced polyethylene internal vapor barriers
Airtight sealing tapes, grommets for pipe penetrations, and EPDM flashing membranes
B-s1,d0 flame retardant membranes ensuring maximum moisture control and energy efficiency
Roll packages with application tapes and fixing accessories
SerBuild manufactures Waterproofing Membranes & Vapor Barriers using dedicated CNC roll-forming lines integrated directly with our 3D BIM modeling software.
Every hole, dimple, lip, and service opening is pre-punched to 0.5mm accuracy before profile folding. This eliminates on-site measuring, cutting, and drilling errors, allowing construction crews to assemble components with simple hand tools.
Detailed answers to technical, manufacturing, export, and on-site assembly questions.
SerBuild designs and manufactures light gauge steel (LGSF) and heavy structural steel buildings for residential developments, industrial warehouses, manufacturing factories, aircraft hangars, commercial offices, and agricultural halls.
Yes. All structural engineering is performed strictly according to Eurocodes (EN 1990, EN 1991, EN 1993, EN 1998) including project-specific National Annex parameters for local snow, wind, and seismic loads.
We offer five flexible delivery packages: Engineering Only, Supply Only (containerized flat-pack kit), Supply with On-Site Supervision, Complete Frame Installation, and Turnkey Project Delivery in eligible regions.
Components are precision roll-formed or cut, permanent piece-marked, and packed in dense weather-protected flat-pack bundles optimized for 40ft High Cube containers, accompanied by detailed 3D packing lists and assembly manuals.
Submit your project location, building dimensions (width, length, eave height), intended use, and any available architectural drawings or sketches via our 5-step RFQ form. Our engineering team reviews the submission and responds within 24–48 hours.
Real-world evidence of precision Eurocode engineering, containerized export, and on-site assembly execution.
Challenge: Severe coastal bora wind gusts (up to 180 km/h) and high seismic ground acceleration in the Adriatic coastal z...
Challenge: 30-meter column-free clear span required to maximize high-bay pallet racking, integrated with a 10-ton overhea...
Challenge: 12 integrated loading docks, high internal clearance of 12 meters, strict NF EN French Eurocode compliance, an...
Submit your project dimensions, drawings or requirements for an engineering review and itemized quote within 24–48 hours.