High-efficiency multi-level steel parking garages and modular park decks designed for hospitals, shopping malls, transport hubs, and corporate campuses.
| Clear Span Range | 16 to 17.5 meter long-span composite steel beams for 100% column-free parking stalls and driving lanes |
|---|---|
| Height & Storey Range | 2 to 8 parking decks with single or split-level ramp configurations |
| Structural Steel Quality | S355JR / S355J2 Structural Steel with Hot-Dip Galvanized / Duplex Anti-Corrosion Protection |
| Available Delivery Scope | Supply Only (Prefabricated bolted steel kit) • Supply + Supervision • Complete Frame Assembly |
| Ideal Project Types | Hospital & medical campus car parks, Airport & railway station parking garages, Shopping center multi-deck parking, Corporate office employee park decks |
SerBuild engineered Multi-Storey Steel Car Parks systems are custom designed around project-specific loads, spans, and building geometry. We eliminate intermediate columns to maximize internal usable floor area while maintaining rigorous structural safety factors under European Eurocodes.
All structural components are precision fabricated in our factory in Türkiye using automated CNC roll-forming and robotic welding lines, pre-punched for 100% bolted field assembly without on-site hot work.
Every element is permanently coded and bundled according to strict 3D container packing algorithms, ensuring rapid, sequential offloading on your job site.
Engineered for durability, wind resistance, and zero thermal bridging.
Hot-rolled structural sections (S355JR / S355J2) or high-tensile cold-formed galvanized C/U sections (S350GD + Z275). Shot-blasted to SA 2.5 standard with certified corrosion protection.
Continuous cold-formed Z and C purlins with overlapping lap joints for maximum structural stiffness, combined with high-tensile threaded rod or cable cross-bracing.
Compatible with PIR/PUR sandwich panels (40mm–200mm), non-combustible rockwool panels (REI 120), or architectural fiber cement rainscreens with integrated thermal break strips.
Every building is calculated using site-specific meteorological and seismic coordinates:
We deliver complete foundation engineering documentation for your local civil engineer: anchor bolt coordinates, reactions tables, and pre-welded positioning cages.
Laser verification of cast-in anchor bolts against SerBuild foundation coordinates.
Columns and rafters lifted with mobile crane and secured with Grade 8.8/10.9 bolts.
Continuous galvanized Z-purlins, wall girts, and high-tensile cross-bracing cables installed.
PIR sandwich panels, flashings, and gutters fastened with airtight sealants.
Real-world evidence of precision Eurocode engineering, containerized export, and on-site assembly execution.
Challenge: Severe coastal bora wind gusts (up to 180 km/h) and high seismic ground acceleration in the Adriatic coastal z...
Challenge: 30-meter column-free clear span required to maximize high-bay pallet racking, integrated with a 10-ton overhea...
Challenge: 12 integrated loading docks, high internal clearance of 12 meters, strict NF EN French Eurocode compliance, an...
Detailed answers to technical, manufacturing, export, and on-site assembly questions.
Our structural steel core and long-span floor joists allow open, column-free floor plans, giving tenants complete freedom to reconfigure modular partition walls over time without structural constraints.
Yes. Structural steel columns and facade mullions are engineered with tight deflection tolerances (L/500 or tighter) specifically designed to carry heavy double and triple-glazed curtain wall systems.
Yes. All framing is non-combustible Euroclass A1, and wall/floor assemblies are tested to meet BB93 acoustic criteria (>55 dB sound reduction) and REI 60 to REI 120 fire barrier ratings.
Standard commercial retail buildings (800 m² – 3,000 m²) are typically fabricated in 3 to 4 weeks and erected on site in 2 to 3 weeks, enabling rapid grand opening dates.
Yes. All light gauge floor joists and wall studs can be pre-punched with CNC service holes, allowing plumbing and electrical conduits to run within the wall depth without on-site cutting.
Our data center steel buildings are calculated per Eurocode 3 and EN 1090-2 EXC3 for 1,500–2,500 kg/m² floor loading, heavy overhead busway/cable tray grids, and reinforced roof plant decks supporting multi-ton chillers and backup generators.
Off-site CNC steel fabrication shortens shell-and-core delivery by 40–60% compared to cast-in-place concrete, delivers column-free 9m–18m server hall grids, and achieves Euroclass A1 / REI 120 passive fire compartmentalization.
Submit your project dimensions, drawings or requirements for an engineering review and itemized quote within 24–48 hours.