266 m² Contemporary Light Gauge Steel Villa in Split, Croatia
Engineering Challenge: Severe coastal bora wind gusts (up to 180 km/h) and high seismic ground acceleration in the Adriatic coastal zone, combined with a tight 6-week dry framing deadline on a hillside plot.
Result: Complete structural framing erected and sheathed in only 14 work days with zero dimensional deviations.
Full Case Study & Scope →