Conforme aux Eurocodes & Livraison Internationale

High-Bay Steel Logistics Hubs & Distribution Centers

Engineered wide-grid steel structures optimized for high-volume automated logistics operations, narrow-aisle racking systems, and multi-dock loading bays.

Demander un Devis de Projet Demande WhatsApp Rapide
Conception Certifiée Eurocodes 3 & 8
Contrôle Qualité Usine EN 1090-2
Empotage Conteneur 40ft HC en Colis Plat
Assemblage 100% Boulonné (Zéro Soudure)

Fiche Technique Rapide

Conforme Eurocode 3
Gamme de Portée Libre Grid layouts with 24m–36m main spans and 12m modular bay spacing
Hauteur & Nombre d'Étages 10 to 18 meters clear internal height for high-bay racking
Qualité de l'Acier & Galvanisation S355 Structural Steel + High-Yield Welded Haunches
Options de Livraison Disponibles Supply Only • Supply + Supervision • Complete Installation
Applications Idéales E-commerce fulfillment centers, 3PL freight forwarding hubs, Cross-docking logistics facilities

Aperçu d'Ingénierie & Portée Structurelle

SerBuild engineered Logistics & Distribution Buildings systems are custom designed around project-specific loads, spans, and building geometry. We eliminate intermediate columns to maximize internal usable floor area while maintaining rigorous structural safety factors under European Eurocodes.

All structural components are precision fabricated in our factory in Türkiye using automated CNC roll-forming and robotic welding lines, pre-punched for 100% bolted field assembly without on-site hot work.

Every element is permanently coded and bundled according to strict 3D container packing algorithms, ensuring rapid, sequential offloading on your job site.

Principaux Avantages d'Ingénierie

  • Column grids configured specifically to maximize pallet positions per square meter
  • Engineered perimeter canopies and integrated loading dock leveler framing
  • FM Global / NFPA compliant roof truss framing designed for early suppression fast response (ESFR) sprinkler systems

Ossatures Porteuses & Enveloppe

Conçu pour la durabilité, la résistance au vent et la rupture thermique totale.

Acier de Structure Primaire

Profilés laminés à chaud (S355JR / S355J2) ou profilés formés à froid galvanisés (S350GD + Z275). Grenaillage SA 2.5 avec protection anticorrosion certifiée.

Pannes, Lisses & Contreventements

Pannes Z et C continues avec éclissage pour une rigidité maximale, combinées à des croix de Saint-André en câbles ou ronds d'acier.

Bardage & Isolation Thermique

Compatible avec panneaux sandwichs PIR/PUR (40mm–200mm), laine de roche incombustible (REI 120) ou façades ventilées en fibres-ciment.

Évaluation des Charges selon les Eurocodes

Every building is calculated using site-specific meteorological and seismic coordinates:

  • Snow Load (EN 1991-1-3): Calculated for ground snow loads up to 4.5 kN/m² with drift accumulations.
  • Wind Load (EN 1991-1-4): Verified for peak gusts, terrain roughness categories 0 to IV, and coastal pressures.
  • Seismic Design (EN 1998): Ductile energy dissipation with structural behavior factor q up to 3.0.

Réactions de Fondation & Ancrages

Nous fournissons l'ensemble des données pour votre bureau d'études béton : plans d'implantation des tiges d'ancrage, descentes de charges et gabarits de pose.

  • Anchor Bolt Layout Plans: Exact coordinates, diameters, and embedment depths.
  • Reaction Force Tables: Maximum axial compression, tension uplift, shear, and overturning moments.
  • Anchor Hardware: Pre-welded anchor bolt positioning cages supplied with the kit.

🛠️ Factory Quality Control & Site Assembly Process

01
Anchor Verification

Laser verification of cast-in anchor bolts against SerBuild foundation coordinates.

02
Frame Erection

Columns and rafters lifted with mobile crane and secured with Grade 8.8/10.9 bolts.

03
Purlin & Bracing

Continuous galvanized Z-purlins, wall girts, and high-tensile cross-bracing cables installed.

04
Cladding & Seal

PIR sandwich panels, flashings, and gutters fastened with airtight sealants.

Références de Projets Similaires

Preuves concrètes d'ingénierie Eurocode, d'exportation conteneurisée et de montage boulonné sans soudure.

Split, Croatia Supply + Supervision

266 m² Contemporary Light Gauge Steel Villa in Split, Croatia

Défi : Severe coastal bora wind gusts (up to 180 km/h) and high seismic ground acceleration in the Adriatic coastal z...

266 m² (2,863 sq ft) Voir l'Étude de Cas →
Bavaria, Germany Supply Only (Kit Package)

1,800 m² Clear-Span Steel Logistics Warehouse in Bavaria, Germany

Défi : 30-meter column-free clear span required to maximize high-bay pallet racking, integrated with a 10-ton overhea...

1,800 m² (19,375 sq ft) Voir l'Étude de Cas →
Lyon, France Supply + Supervision

4,500 m² Logistics Distribution Center in Lyon, France

Défi : 12 integrated loading docks, high internal clearance of 12 meters, strict NF EN French Eurocode compliance, an...

4,500 m² (48,438 sq ft) Voir l'Étude de Cas →

Foire Aux Questions (FAQ)

Réponses détaillées sur l'ingénierie Eurocode, la fabrication, l'exportation et le montage.

Nous réalisons des portées libres de 12 à plus de 60 mètres en portiques rigides et jusqu'à 90+ mètres en structures tridimensionnelles pour libérer 100% de l'espace au sol.

Oui. Nous concevons les poteaux avec corbeaux intégrés et fournissons les poutres de roulement dimensionnées pour des ponts roulants de 5 à 30+ tonnes (EN 1993-6).

Non. Toutes les pièces sont pré-percées et usinées en usine. L'assemblage sur site est 100% boulonné avec de la boulonnerie HR (classes 8.8 et 10.9) sans travaux à chaud.

Nos structures acceptent les panneaux sandwichs PIR/PUR (40 à 200 mm), la laine de roche coupe-feu, le bac acier simple peau et les lanterneaux en polycarbonate.

Oui. Chaque projet comprend un dossier de fondations complet : implantation des tiges d'ancrage, gabarits et tableau des réactions d'appuis (compression, traction, cisaillement).

Demandez une Étude Technique & Devis

Transmettez-nous vos dimensions ou plans pour une analyse d'ingénierie et une offre détaillée sous 24 à 48 heures.

1
2
3
4
5

Étape 1 : Quel type de bâtiment en acier prévoyez-vous ?

Étape 2 : Emplacement du Projet & Dimensions Souhaitées

Étape 3 : Mode de Livraison Préféré

Étape 4 : Calendrier du Projet & État d'Avancement

Étape 5 : Coordonnées & Envoi de Plans

Consultation WhatsApp Directe